Property ID: 45881

Uttara West, Dhaka, Bangladesh

Sale Price 8,500.00৳ Per sft

Utility cost Negotiable

 

Property ID: 45881

Uttara West, Dhaka, Bangladesh

Sale Price 8,500.00৳ Per sft

Utility cost Negotiable

+880170846
 
Click here to show phone number
Mahmudul Hasan Shawon
Property Detail
5th Floor
Total Floors 9
2300 sft Space
Land Size 5.20 katha
Total Apartments 8
3 Attached Bath(s)
3 Bed(s)
1 Common Bath(s)
Dining Space
Living Space
1 Staff Toilet(s)
4 Balcony(ies)
Tiled Floor
1 Staff Room(s)
1 Parking(s)
Project Type Residential Apartment
Description

This is a luxurious exclusive G+8 storied apartment project named GREEN NAHAR LIVING designed by modern, young talented, qualified & experienced architects & engineers and made with distinct environmental advantages with highest comfort for living on a corner plot near to airport and highway, well ventilated & airy, get lots of natural lights. The Apartment building facilitate with a wide-space efficient lift, a heavy-duty sub-station including a UK origin sound-proof standby generator. The building having comfortable parking space with architectural excellence. 

Each apartment having 3 bed rooms with individual balcony french windows & full balcony opening doors, 1 guest-room/reading-room/servant-room, 4 bath-rooms, 1 Drawing-room, a very wide dinning with family living space and a wide kitchen area with a veranda. Each flat is finished with all exclusive quality standard fittings.

The total price [Tk. 1,85,90,000 includes Flat value Tk.1,79,40,000(Tk.8500/SFT) + Parking Tk.4,00,000 + utility charges Tk.2,50,000] mentioned here is asking price, which is negotiable for a deserving customer.

Geographical Details
Facilities
  Gas Connection
  DESCO Connection
  WASA Connection
  Concealed Phone
  Concealed Cable TV
  Intercom
  CCTV
  Lift
  Generator
  Internet Connection
  Community Hall
  Roof Top Garden
Safety
  Fire Extinguisher
  Emergency Exit
Financial Detail
Sale Price 8,500.00৳ Per sft
Utility Cost
Utility cost Negotiable
Parking cost Negotiable
Status
Project Status Ongoing
Hand Over Date 31 Dec, 2015
<