Property ID: 88825

Mohammadpur , Dhaka, Bangladesh

Sale Price 78,00,000.00৳ Per sft

Utility cost Negotiable

 

Property ID: 88825

Mohammadpur , Dhaka, Bangladesh

Sale Price 78,00,000.00৳ Per sft

Utility cost Negotiable

 
Click here to show phone number
Property Detail
1st Floor
Total Floors 10
1350 sft Space
Land Size 12.00 katha
Total Apartments 18
2 Attached Bath(s)
3 Bed(s)
1 Common Bath(s)
Dining Space
Living Space
4 Balcony(ies)
Tiled Floor
Project Type Residential Apartment
Description

Mohammadpur is a posh area for living, surrounded by shopping mall, private university, School, Collage, Hospital and restaurent. This building is located at Mohammadpur, Kaderabad Housing Estate Ltd area which enhances easy communation with any of dhaka city. Modern and beautiful apartment buildings developed by SARA Builders Limited with the skilled touch and dedication. Only 1 (One) flat have constructed in each floor on the land area of 12 katha in project SARA Mona. So each flat contains the size of 1350 sft. Two lifts, one generator, one sub-station, guard and driver rooms including their living facility will be arranged at the ground floor of SARA Mona. Each floor will be alloted a car parking and every respected owner will share the common areas, roof top, garden and the community hall as well. Geyser at master bath, spacious drawing dinning and family living, connection for the T&T line, cable operators line, wifi line etc modern facilities are available for every flat of SARA Mona which will allow all the residents a modern comfortfull living style. 

Faruque 

01717937641

Geographical Details
Facilities
  Gas Connection
  DESCO Connection
  WASA Connection
  Concealed Phone
  Concealed Cable TV
  Intercom
  CCTV
  Lift
  Generator
  Internet Connection
  Community Hall
  Roof Top Garden
Safety
  Fire Extinguisher
  Smoke Detector
  Water Sprinkler
  Fire Hose
  Emergency Exit
Financial Detail
Sale Price 78,00,000.00৳ Per sft
Utility Cost
Utility cost Negotiable
Parking cost Negotiable
Status
Project Status Ongoing
Hand Over Date 30 Jun, 2019
<